Sperry Marine 65837AC: matching the Scanner Control Unit power supply and version

65837AC is the Scanner Control Unit, the scanner control unit. The application “block 65837A” is not enough for it: the final letter refers to the configuration, and the selection must take into account the power supply of the engine and the mode of the antenna device. Before ordering, check the nameplate of the existing unit and the data of the entire installation.

Request a quote

Schematic illustration of a node type is not a photograph of a sold instance
Schematic illustration from the RadarStation catalog. Please request photos of the actual copy or package before ordering.

Where is the task of this block?

In the User Guide BridgeMaster E Scanner Control Unit is listed as a separate node on and off the scanner in the S-band system. It is different from the operator's remote and from the rotary device on the mast. Therefore, ordering a control unit does not mean supplying an antenna, motor or transceiver.

Category names in the directory help find the position, but the set is determined by its own designation. For the 65837AC, you need to agree on the Scanner Control Unit and the necessary accessories. If the task involves restoring the entire antenna setup, its composition should be described further.

What does C mean in the designation

In the System Identification table of the VisionMaster FT manual for the 65837A family, the C suffix is associated with two combinations: a three-phase power supply of 220/240 V at a standard speed or a three-phase 380/440 V at a high speed. Therefore, the abbreviation "C is 220 V" does not describe all the options given in the table.

The manual also specifies the SCU’s internal setting by thermal protection current and number of phases. This means that a single match of the inscription on the case is not enough to allow connection. The quotation must confirm the actual configuration and settings for the specific engine. This information is not replaced by an assumption about the available on-board network.

What data to send for reconciliation

  • Photo of the nameplate of the installed SCU, including the last letter and serial number.
  • Full type of rotary device and engine data.
  • The number of phases and voltage of the power supply chain of the engine according to the ship's documentation.
  • Statutory speed and information about existing protections.
  • Connection scheme, designations of cables and retained nodes.

It is useful to attach a photo of the designations of existing settings, taken by the service as part of its work. The buyer does not need to change the protection to form a request. First, the configuration and the necessary verification of the supplied block are agreed.

What to include in quotation and acceptance

Separate the supply of the block itself, the connection set and service work. Check whether the check of settings for the agreed engine and what results will be transmitted. The New mark refers to the status of the position in the catalogue, but does not confirm the performance of the setup for a particular vessel.

After installation, coordinate the scanner control and protection check according to the documentation of this system. If a different suffix is proposed or a replacement of a block of another series is proposed, ask for a written basis for applicability and a list of necessary changes. A similar housing or common family number is not sufficient evidence of a direct replacement.

Card and documents

Supply and coordination

Scanner Control Unit 65837AC is listed as New · 1. Availability, reserve, actual configuration and scope of verification are confirmed by quotation. No public price has been set.

Price and term - by quotation for the agreed composition. Specify the port or city, the required date, documents and method of acceptance. A mark in the catalog helps to select a position for the request; the actual balance and reserve are confirmed before the order.

Request a quote

Select a different theme for the technical guide