Sperry Marine 65901AT VisionMaster FT: processor, software configuration and package contents
The 65901AT is designated as the VisionMaster FT Processor Unit. The buyer receives an agreed processor unit, and a separate statement determines the completeness of the workplace. For an existing bridge, it is important to link the supplied equipment in advance with the desired functions, software version and retained devices.
What is required after replacement
Specify the purpose of the installed workplace: radar, Chart Radar, ECDIS or other agreed set. The Sperry Marine VisionMaster FT Chart Radar brochure describes different configuration formats and additional features. Belonging to the family does not mean that all of the listed options are activated on any processor with a similar number.
Attach a sign of the 65901AT to be removed, the version of the installed software and a list of features that should be saved. If the reason for the appeal is the block failure, add the conclusion of the service organization. This separates hardware replacement from software configuration updates and data recovery.
Statement of retained employment
| Indication and management | Accurate models of the display and controls, their configuration and operating connections. |
|---|---|
| Input and network | Installed interface devices, data sources, and interactions with other workplaces. |
| Programme part | Agreed version, necessary options and documents for the legal use of the supplied composition. |
| Supplies | Cables, response parts, mounting elements and documentation: included, saved or supplied separately. |
What is transferred and what is checked again
Confirm in advance to save the necessary marine settings and data. Copying or restoring requires a manufacturer-defined procedure and a suitable system configuration. The presence of a drive in a former processor does not confirm the right to use all applications and cards on it.
In quotation, it is useful to separate hardware, software training and work on the ship. If any part is performed by another contractor, state its initial requirements before purchase. Otherwise, a serviceable unit may arrive without an agreed configuration for a specific workplace.
Acceptance of a specific processor
Ask for the marking and photos of the proposed copy, a list of inspections performed and information about the composition of the assembly. For former equipment, separately coordinate the state of the drive, connectors and cooling kit; actual results are more important than the general phrase “after check”.
Completion of the replacement is confirmed by the work of the agreed functions on the installed system. The protocol includes precise configuration and connected devices. For quotation, send the initial statement, the required state, port and term; make the extension of functions a separate task if it is really required.
Card and documents
- Sperry Marine: VisionMaster FT Chart Radar - configurations and options
- 65901AT: processor unit in our catalog
Supply and coordination
In the catalog for 65901AT, new and former instances are separately marked. Condition, kit, configuration and actual reserve are agreed upon for a particular delivery.
Price and term - by quotation for the agreed composition. Specify the port or city, the required date, documents and method of acceptance. A mark in the catalog helps to select a position for the request; the actual balance and reserve are confirmed before the order.