BB31-1, MB31-1, BH31-1 and GAC-198: mounting, pedestal and azimuth ring

When buying a repeater post, Tokyo Keiki is useful to divide three tasks: fix the device, install it at the desired height and ensure directional positioning. The names "mounting", "pelorus" and "ring" in correspondence are sometimes mixed. For ordering more reliable full designations, a photo of the place and a separate line for each belonging.

Request a quote

Schematic illustration of a node type is not a photograph of a sold instance
Schematic illustration from the RadarStation catalog. Please request photos of the actual copy or package before ordering.

Different roles in the same post

The BB family is named Bearing Bracket, MB – Mounting Bracket, BH – Bearing repeater Horizontal stand, GAC-198 – Azimuth Circle. The historical list of TG-8000/8500 equipment separately lists BB-31-1, MB-31-1 and BH-31-1 for serial repeater configuration. A short entry in the series does not replace the reconciliation of the full code supplied.

Positions for the statement
BB31-1Fixing of the directional repeater. Coordinate the installation and actual composition of the connecting part.
MB31-1The bulkhead mount option. Check the access and orientation of the device at the selected location.
BH31-1BH family rack position. The height of the post, the base and the set of coverage require separate approval.
GAC-198Azimuth ring: a separate accessory for measuring directions.

What does "post complete" mean?

If BH31-1 is called a pelorus in the original application, decipher what exactly you need to get: a rack, a repeater, a lid, a ring or a full set. The report should clearly list these items and their number. A general photograph of a fixed post does not prove that all visible parts are included in the price of an individual item.

For the repeater to be saved, attach its full marking and photos of the landing. For a new post, align the device model and mounting accessories together. Do not choose the mount only on the externally similar diameter: you need to confirm the mechanical compliance and the connection provided.

Place check prior to shipment

  • Indicate the bridge wing, bulkhead or other place; attach the view of the base and available dimensions.
  • Show cable route, inputs, access for connections and maintenance.
  • Confirm the intended function: heading observation or bearing-taking with a separate accessory.
  • Separate factory supplies and marine base preparation work.

Acceptance without missing details

Before dispatch, request photographs and an inventory: designations, fasteners, connecting parts, protective components and separately agreed accessories. Compare them with the quotation on receipt. Checking heading indication and the bearing-taking station after installation concerns the complete installed system; mounting completeness is no substitute.

In the letter, specify which parts are already available, what needs to be replaced, the number of posts and the deadline. To replace one damaged mounting part, such a statement helps to keep the serviceable elements, and for a new post - to determine a full order in advance.

Card and documents

Supply and coordination

BB31-1, MB31-1, BH31-1, and GAC-198 are represented by separate catalog entries. The necessary combination, actual composition and presence of each line are confirmed by application.

Price and term - by quotation for the agreed composition. Specify the port or city, the required date, documents and method of acceptance. A mark in the catalog helps to select a position for the request; the actual balance and reserve are confirmed before the order.

Request a quote

Select a different theme for the technical guide