RS and RKO rules: practical application

Radar replacement: design and survey of the installation

Buying a new radar and accepting its installation are different upgrade stages. A quotation may list the display, antenna assembly and accessories while leaving design documents and onboard testing undefined. Define these tasks before ordering so that equipment and documentation describe the same configuration.

Drawn-off radar screen in console next to empty plan and line before preparing replacement
Original editorial illustration. The layout is schematic; the drawing specifies no installation dimensions and does not depict a particular product version.

Area of the rule

Basis -- clause 1.3.3 of Part V, Navigation Equipment, of the RS Rules for the Equipment of Sea-Going Ships, edition 01.01.2026. Clause 1.1.1 limits this Part to self-propelled ships not engaged on international voyages. Applicable requirements for other operating conditions must be established separately. Under clause 1.1.3, additional flag-administration instructions take precedence in the event of conflict with the rules.

On a ship in service, when new navigation equipment is installed or obsolete equipment, or failed equipment that cannot be repaired, is replaced, the installation technical design and working drawings must be submitted to the Register before the survey begins. After their approval, the installed equipment is surveyed and tested in operation. The rule also provides for proper adjustment after installation.

What belongs to the design for the particular vessel?

To replace KODEN MDC-7912P, which the manufacturer classifies as a marine radar, the manufacturer's documentation describes the equipment and its intended configurations. The vessel design must connect the selected configuration to the actual bridge, antenna, power supply and other systems of that particular ship.

Project information must therefore identify all retained units and lines. Saying 'replace only the screen' does not establish that the old antenna assembly, controls and interfaces suit the new version. The technical solution must reflect the actual scope of work; a product page does not replace that assessment.

Documents for equipment and installation project

Clause 1.3.2 describes navigation-equipment technical documentation submitted for review. Where applicable, it includes a technical description, block diagram, general arrangement, operating manual, installation instructions and spare-parts list. Previous test reports and existing certificates may be submitted; additional documents may be required depending on equipment type.

This list helps check the manufacturer's document package. It does not remove the separate installation-design requirement for a ship in service under clause 1.3.3. General survey and document-issue procedures are also linked to the RS documents referenced in clause 1.3.1.

How to distribute work in quotation

PhaseWhat the customer should understand
SurveyUnits, cables and structures to be retained
Choosing a configurationThe actual radar package under consideration
Project and working drawingsWho prepares and submits documents
Installation and adjustmentWhat works are included in the scope
Survey and testingWhat is presented for survey and how the result is recorded

For ships under construction, the same clause separately describes operational testing of navigation equipment and electromagnetic-compatibility testing of radio and navigation equipment on and near the bridge during dock and sea trials under approved programmes. That wording should not be transferred without explanation to every isolated repair on a ship in service.

What to attach to the request

Provide the vessel, design, class, operating area, existing radar and reason for replacement. Attach connection diagrams, bridge and antenna-location plans, marking photographs and a list of retained equipment. Ask for supply, design, installation and presentation for survey as separate quotation items. Availability, approval of the particular version and lead times must be supported by documents and the quotation.

The source of the norm the official Part V of the RS Rules1.1.1 to 1.1.3 and 1.3.1 to 1.3.3. The marine role of the model. Koden official page.

Send project details for a quotation